Question 17 (Textile Engineering & Fibre Science)
The 100% production of draw frame producing 2 ktex sliver at 500 m/min is ______ kg/hr per delivery.
The 100% production of draw frame producing 2 ktex sliver at 500 m/min is ______ kg/hr per delivery.