Question 2.18 (Textile Engineering & Fibre Science)
A loom running at 200 rpm with 80% efficiency and inserting 60 picks per inch would produce in one hour a length of fabric equal to
(A) | 3.06 m |
B) | 3.56 m |
(C) | 4.06 m |
(D) | 4.56 m |
[Show Answer]
write here